DATE OF DELIVERY1st quarter, 2017
CONSTRUCTION SITE44.500 m²
DELIVERYGround Floor + 10 Floors 4 Podiums
GROSS FLOOR AREA1193 - 5506 m²
HEATING - COOLING SYSTEMHeating with natural gas-fired boilers for offices and common areas, the cooling system will be done in centralized systems with water-cooled chillers. Using a 4-pipe fan coil heating and cooling system for the common areas will be realized. Heating and cooling systems will be left in the office ready for the installation of appropriate infrastructure in the 4-pipe fan-coil system. Heating and cooling costs for each individual section will be measured by calorimetry. Shops-market-café areas for VRF infrastructure will be prepared.
NO. OF CLOSED CAR PARKS383
NO. OF CAR PARKS
PER FLOOR22
ENVIRONMENTAL AWARENESSGOLD LEED CERTIFICATE
GENERAL BUILDINGThe application will be used in the manufacturing process all materials and Turkish Standards will be held, it will be in accordance with national norms in their respective Public Specification and related fields.
FRONT WORKSThe exterior curtain wall system will be implemented. Exterior and has a high thermal and acoustic insulation properties. To form the basis for the exterior design was built wind simulation test.
WALL WORKSIndependent interdepartmental capable of sound insulation in partition walls or gas concrete drywall. Tank walls, gas rise to the ceiling, drywall or concrete. The communal areas will be used for gas concrete and drywall.
FLOOR COVERINGThe floor of independent parts; In accordance to the raised floor it will be left as a concrete surface elevation. Raised floor property will be held by the owner or tenant. natural stone flooring and floor halls will be held in public areas. wet in 1st class ceramic tiles will be made available in public areas. Suitable materials for architectural projects in the social area in common use (natural stone, carpet, ceramic, wood, etc.) will be used. Indoor parking and storage areas in the floor surface of the hardener is applied. epoxy paint will be used on stairs locations.
WALL COATINGSIndependent section of the wall made of aerated concrete or plaster over drywall will be delivered. Natural stone cladding will be used in all elevator halls. Social architecture in common use according to the project of wood, natural stone, wall paper, plaster painting, etc.. material will be used. Concrete over all service and fire escape corridor paint will be applied. Parking garage parking guidance over the concrete surface paint on the walls and columns, the warehouse will be delivered in gas concrete or drywall over the plaster.
DOORSIndependent chapter gates suited to interior doors temporarily after the aluminum will be completed by the owner or tenant. In areas where fire regulations require fire-resistant, certified, panic push bar'l steel doors will be installed. Tower revolving glass door entrance to the project and appropriate standards, will be found. architectural appropriate steel or aluminum framed doors, wood siding will be made available in public areas. Wet doors will be compact laminate door. Warehouse doors will be steel framed steel or aluminum doors.
CEILSIndependent units will be delivered as a concrete ceiling. The communal areas will be manufactured drywall suspended ceiling. All common use of wet areas moisture-resistant drywall ceiling or variable depending on the design of the ceiling material will be made. Parking ceilings, concrete fire escape and will be delivered as a service corridor ceiling paint over the concrete surface.
WET AREASAppropriate water-saving fixtures will be used to LEED criteria 1. Quality. Production of compact laminate partition walls in wet areas will be made. 1st class ceramic tiles on the floor according to the project will be made.