Tahincioğlu Real Estate is a Tahincioğlu Holding group company, operating in the real estate development and investment areas. Tahincioğlu Real Estate, one of Turkey’s leading trademarks in the real estate industry, undertakes premium retail, office, residence and shopping mall projects as well as the construction and development of luxury hotels with an experience of over 65 years.
In addition to these projects, the company also actively manages its extensive portfolio comprised of revenue-generating real estate assets. The total construction area of projects completed by Tahincioğlu covers over 4 million square meters to date.
As of 2020, Tahincioğlu has established two new companies, namely Tahincioğlu Management and Services and Nidapark Real Estate, expanding its services in the real estate sector while maintaining its ongoing activities.
Tahincioğlu’s construction company Nida Construction is the general contractor for all Tahincioğlu projects. Among the projects that have become synonymous with the company are Palladium Tower, Palladium Ataşehir Shopping Mall and Residence, Palladium Antakya Shopping Mall, Nidakule Kozyatağı, Nidakule Göztepe and Swissôtel Grand Efes and Convention Center.
Sentido Perissia Hotel and Perissia Hotel Cappadocia are also among the hotel projects developed, constructed and later handed over by Tahincioğlu. The office projects Nidakule Kozyatağı, Nidakule Ataşehir West, Nidakule Ataşehir Sout, Nidakule Ataşehir North, Nidakule Göztepe and Nidakule Levent have been completed, while residential projects Nidapark Küçükyalı, Nidapark İstinye and Nidapark Ayyıldız are still under construction. Having completed and delivered Nidapark Beşiktaş in June 2015, Nidakule Seyrantepe in June 2017, Nidapark Başakşehir in October 2017, Nidapark Kayaşehir in August 2019 and found within the Nidapark Küçükyalı Project the Nidapark Küçükyalı Kınalı Phase in August 2020, Nidapark Küçükyalı Sedef Phase in April 2021. Tahincioğlu has put the Nidapark Çengelköy project up for sale at the end of Q1 of 2021.
| LOCATION | Ataşehir, İstanbul |
| ARCHITECTURE | Aukett Swanke Group |
| DATE OF DELIVERY | 1st quarter, 2017 |
| CONSTRUCTION SITE | 44.500 m² |
| RENTAL AREA | 25.000 m² |
| DELIVERY | Ground Floor + 10 Floors 4 Podiums |
| GROSS FLOOR AREA | 1193 - 5506 m² |
| GROSS FLOOR HEIGHT | 4,2 |
| HEATING | 4-PIPE FCU |
| NO. OF LIFTS | |
| NO. OF CLOSED CAR PARKS | 383 |
| NO. OF CAR PARKS PER FLOOR | 22 |
| ENVIRONMENTAL AWARENESS | GOLD LEED CERTIFICATE |
| CONSTRUCTION | The application will be used in the manufacturing process all materials and Turkish Standards will be held, it will be in accordance with national norms in their respective Public Specification and related fields. |
| FRONT SPIECE | The exterior curtain wall system will be implemented. Exterior and has a high thermal and acoustic insulation properties. To form the basis for the exterior design was built wind simulation test. |
| WALL | Independent interdepartmental capable of sound insulation in partition walls or gas concrete drywall. Tank walls, gas rise to the ceiling, drywall or concrete. The communal areas will be used for gas concrete and drywall. |
| WALL COATINGS | The floor of independent parts; In accordance to the raised floor it will be left as a concrete surface elevation. Raised floor property will be held by the owner or tenant. natural stone flooring and floor halls will be held in public areas. wet in 1st class ceramic tiles will be made available in public areas. Suitable materials for architectural projects in the social area in common use (natural stone, carpet, ceramic, wood, etc.) will be used. Indoor parking and storage areas in the floor surface of the hardener is applied. epoxy paint will be used on stairs locations. |
| WALL COATINGS | Independent section of the wall made of aerated concrete or plaster over drywall will be delivered. Natural stone cladding will be used in all elevator halls. Social architecture in common use according to the project of wood, natural stone, wall paper, plaster painting, etc.. material will be used. Concrete over all service and fire escape corridor paint will be applied. Parking garage parking guidance over the concrete surface paint on the walls and columns, the warehouse will be delivered in gas concrete or drywall over the plaster. |
| DOORS | Independent chapter gates suited to interior doors temporarily after the aluminum will be completed by the owner or tenant. In areas where fire regulations require fire-resistant, certified, panic push bar'l steel doors will be installed. Tower revolving glass door entrance to the project and appropriate standards, will be found. architectural appropriate steel or aluminum framed doors, wood siding will be made available in public areas. Wet doors will be compact laminate door. Warehouse doors will be steel framed steel or aluminum doors. |
| CEILS | Independent units will be delivered as a concrete ceiling. The communal areas will be manufactured drywall suspended ceiling. All common use of wet areas moisture-resistant drywall ceiling or variable depending on the design of the ceiling material will be made. Parking ceilings, concrete fire escape and will be delivered as a service corridor ceiling paint over the concrete surface. |
| WET AREAS | Appropriate water-saving fixtures will be used to LEED criteria 1. Quality. Production of compact laminate partition walls in wet areas will be made. 1st class ceramic tiles on the floor according to the project will be made. |
| ELECTRICAL ENERGY DISTRIBUTION | To meet the energy structure will be medium voltage switchgears and substation facilities that are found in the transformer. Due to the high building structure; floors for power distribution busbar system will be established. Under the project with local regulations on electrical installations will be designed in accordance with European and International Standards. |
| BACKUP POWER SYSTEM | When the utility power fails structure to meet all the needs of 100% of the diesel generator (generator) group will be established. Structure BMS, security systems, management office computers, computer and telephone systems, alarm systems, fire alarm and fire dampers in nature to feed the UPS infrastructure will be created. |
| LIGHTING SYSTEM | The common areas will be provided with 1 class lighting fixtures. emergency lighting and emergency escape lighting in common areas and parking guidance section will be provided with a sufficient amount of emergency luminaires. |
| ELEVATORS | According to the number of floors of the office building project that serves the staff and technical features lifts, 1 service and firefighter elevators; elevator parking facilities will be in accordance with the number and specifications of the project. EMS can be monitored from the control room Lift (Elevator menagement System) will be established. security cameras in the cabin and emergency evacuation system will be established. |
| HEATING - COOLING SYSTEM | Heating with natural gas-fired boilers for offices and common areas, the cooling system will be done in centralized systems with water-cooled chillers. Using a 4-pipe fan coil heating and cooling system for the common areas will be realized. Heating and cooling systems will be left in the office ready for the installation of appropriate infrastructure in the 4-pipe fan-coil system. Heating and cooling costs for each individual section will be measured by calorimetry. Shops-market-café areas for VRF infrastructure will be prepared. |
| VENTILATION SYSTEM | The office floors will be prepared infrastructure of fresh air and exhaust systems for each individual office, the heat recovery unit type will be done centrally by the ventilation air handling units. Office of 10 m² / person admission to 50 m³ / h fresh air will be provided. Central air conditioning in the office floors will be made wet. Parking in the regular floors and smoke exhaust ventilation system will be implemented as fan'l jet system. smoke evacuation system on all floors, fire escapes and emergency elevator pressurization will be applied. |
| FIRE EQUIPMENT | Automatic sprinkler system in the entire building (sprinklers) shall apply. Common areas will be placed in fire cabinets, fire hydrants will be placed around the building. Interoffice pendent (drooping type) sprinkler system Landlord / tenant shall be made by. |
| PLUMBING | Office floors locality common men and women will be wet in all materials used shall comply with TSA and other national regulations. Central water tank and water pump system will be implemented. Wet hot water needs will be met with the local electric water heaters. |
Barbaros Mahallesi Begonya Sokak No:3 34746 Ataşehir/İSTANBUL
Barbaros Mahallesi Begonya Sokak No:3 34746 Ataşehir/İSTANBUL

İnönü Cad. Devres Han No:50 2/A
Gümüşsuyu 34437 Istanbul, Türkiye
T: (+90) 212 334 78 00
F: (+90) 212 334 78 29
[email protected]
Elif EzgeçKıdemli Danışman M: (+90) 533 443 58 95 |
Savaş GürbüzKıdemli Danışman M: (+90) 532 738 66 64 |
Semi SilikiDanışman M: (+90) 537 854 26 37 |